- Reaction score
- -2
I’m meeting with a design–build team next week for the first time, and honestly I’m not sure what that first consultation is supposed to feel like. I’ve only done smaller DIY projects before, nothing major, and now that we’re talking about reworking the whole downstairs layout, I’m a bit nervous about saying the wrong thing or not bringing enough info. If anyone here has gone through that first meeting, what should I expect? Do they dive into details right away or mostly just listen and try to understand how we live in the space?
