Hi everyone.
So I have ordered my first system and it should be in around the first of April. I plan on having a taped perimeter with 3 mil tape in the front, SuperTape behind it for reinforcement, and SuperTape around the sides and back. I've seen a lot about the 24 hour wait time for glues before you can sweat or get it wet but I haven't been able to find if there is also a wait for tapes. So, does that wait time also apply to tapes?
So I have ordered my first system and it should be in around the first of April. I plan on having a taped perimeter with 3 mil tape in the front, SuperTape behind it for reinforcement, and SuperTape around the sides and back. I've seen a lot about the 24 hour wait time for glues before you can sweat or get it wet but I haven't been able to find if there is also a wait for tapes. So, does that wait time also apply to tapes?